R&D CONSULTANT CO.,LTD.
Suite 506B Dusit Thani Building, 5th Floor, Rama IV Road, Bangkok 10500 Thailand. Tel. 022361956 Fax. 022362010

COMPANY PROFILE COMPANY PROFILE
DIRECTORS DIRECTORS
SERVICE SERVICE
PROJECT PROJECT
CONTACT US CONTACT

R&D'S ACTIVITIES AND SERVICES COVER VARIOUS TYPES OF PROJECT

Services

     R&D Consultant offers a full range of consultancy services in the specialized fields of environmental and sanitation enginerring to domestic and overseas clients for such development projects as:

  • Sewage Treatment and Disposal Systems
  • Solid Waste and Night Soil Treatment and Disposal Systems
  • Municipal and Industrial Water Supply Systems
  • Pollution Control and Environmental Preservation
  • Water Resources Development Projects

The following integrated services are provided by the firm, assuming ful responsibility for the execution of projects.

  • Preliminary Studies, Master Planning and Reasibility Studies
  • Detail Design and Preparation of Tender Document
  • Environmental Impact Assessment Studies
  • Project Evaluation, Economic and Financial Analysis
  • Groundwater Investigation, Survey, Geological and Hydrogeological Investigation and Laboratory Testing
  • Construction Supervision
  • Assistance of Operation and Maintenance of the Facilities
  • Training and Technology Transfer

     In conducting consultancy services, preparation of an economically and technically sound and effective development plan is considered by planning, designing, analyzing, experimenting and evaluating and providing guidance on these aspects. In developing programs and plans for the projects the following step by step planning procedures are generally adopted to excute the consultancy services.

Step 1 :
Problem Definition and Specification
Step 2 :
Inventry and Data Accumulation
Step 3 :
Evaluation and Evaluation and Alternative Development
Step 4 :
Preliminary Design, Economic and/or Financial Analysis and Selection of Plan
Step 5 :
Environmental Impact Assessment and Plan Review
Step 6 :
Detail Design, Cost Estimates and Specifications
Step 7 :
Development of Construction Schedule
Step 8 :
Development of Implementation Schedule and Project Financing
 
21 April, 2004
UPDATE